BotlekMaintenance activities are scheduled for several Vapor Recovery Units
(VRU) at Botlek. As a consequence, no product can be pumped
into tanks connected to the VRU’s during the following dates:
- March 1st - 5th: Tanks in Pit 17
- March 3rd - 5th: Tanks in Pit 13 and 14
- March 8th - 12th: Tanks in Pit 18 (other limitations might apply for the Benzene tanks in Pit 18)
TTR
March 6th, the operational controlling system at our TTR terminal will be
updated and improved. These maintenance activities will have the
following impact upon our operations: No Phenol (un)loading will be possible (all modalities)
- Tank Pits 4, 5 and 6 will be blocked for truck and rail (un)loading
- Discharging ex vessel into tanks 405, 406, tank Pit 5 and tank Pit 6 will be blocked for the following products: Ethanol, Acetone, Acrilonitrile, MTBE, Propylene Oxide, Cyclohexane
- Vessel and barge loading for products that are governed by the Dutch ‘Gasoline Directive’ will not be possible (e.g. Acrilonitrile)
April 1st, Jetty number 4 will be unavailale in the morning due to welding activities.